Glossary
The words this guide uses for the network, heights, OTDR measurements, deliveries and offline work, one sentence each.
One sentence per term, grouped by topic. Search finds every term by its name.
The network
Node
A place in the network with a measured position and height: a handhole, manhole, cabinet, splice closure, pole, or a single surveyed point such as a bend.
Handhole
A small underground chamber where cables can be pulled, spliced or stored; in ruumica a type of node.
Span
The physical route between two nodes, such as a trench or a duct, with its course of points and its length.
Split
Adding a node in the middle of a span: the span is retired, and two new spans take its place.
Cable
A cable with a number of fibres that runs through one or more spans along its route.
Route
The ordered list of spans a cable runs through, each in or against the span’s direction.
Fibre
One glass fibre in a cable, named by its tube colour, fibre colour and number.
Splice
The joint of one fibre of one cable to one fibre of another, in a closure at a node.
Slack loop
Spare cable stored at a node, such as a coil in a vault; it counts toward the fibre’s length.
Evidence
A photo, video or sketch of a node or span, kept unchanged and named by its fingerprint.
Heights and coordinates
Elevation
A height above the national reference surface in the project’s height system; never a depth.
Height system
The national reference for elevations, such as EH2000 in Estonia or NN2000 in Norway.
Ellipsoidal height
The height a GNSS receiver measures, above a smooth mathematical shape of the earth; it differs from an elevation by many metres.
Geoid model
A grid of the difference between ellipsoidal heights and elevations, published by the national mapping authority, such as EST-GEOID2017.
L-EST97
The Estonian national map coordinate system (EPSG:3301).
Pipeline
One fixed, verified recipe for converting GNSS coordinates into a project’s delivery coordinates; it is never changed in place.
Grid
A data file a pipeline needs, such as a geoid model, identified by its SHA-256 fingerprint.
Control point
A national reference point the survey is tied to, with official coordinates.
Depth
A distance measured downward from the ground surface, such as the cover over a duct.
OTDR measurements
OTDR
An optical time-domain reflectometer: an instrument that sends light into a fibre and records what returns along its length.
Event
A point along a fibre where the OTDR sees a loss or a reflection, such as a splice, a connector or the fibre end.
Group index
The value (IOR) an OTDR uses to turn the time of travel of light into distance; a wrong value shifts every distance.
Pair
Two measurements of the same fibre, one from each end, at the same wavelength, judged together.
Length factor
How much longer a cable’s fibres are than its route, because they lie in a helix with some excess length.
Reflectance
How much light an event sends back, in dB; the more negative, the better.
Verdict
The judgement of a trace: PASS, FAIL, or PROVISIONAL while only one direction is measured.
Deliveries
Freeze instant
The moment whose state of the project a delivery contains, given in UTC with --frozen-at.
Frozen package
Every fact a delivery is made from, as of the freeze instant, in one document (package.json).
Closeout package
The folder and ZIP an export writes: drawing, data files, closeout book, raw evidence and manifest.
Closeout book
The PDF in a closeout package, written for the person who accepts the delivery.
Manifest
The file manifest.json, which lists every file of a closeout package with its fingerprint.
Fingerprint
The SHA-256 of a file: 64 characters that change completely if one byte of the file changes.
Export profile
The file that decides layers, symbols, title block and sheet for one authority; provisional or production.
Bill of quantities
The built lengths and counts of a project, as of a freeze instant, in whole millimetres and pieces.
Quality level
How reliably a position is known, from QL-A, the most reliable, to QL-D; assessing it is not built yet.
Offline work
Op
One change made in the field, such as a new node or a splice, sent to the server as a self-contained record.
Starting point
The project as it was when offline sync was turned on, from which every replay begins.
Replay
Recomputing a project from its starting point with every op in the agreed order, when an op arrives late.
Hold
The server keeping an op from taking effect until a reason is resolved, such as a missing height.
Conflict
Two changes that contradict each other; the later one has no effect until the office decides.
Edge
The part of ruumica that runs at Cloudflare and receives ops and uploads from the field app.